System In Organizations

Planning and System Installation

Computer System

A computer system is a broad term given to a system including the hardware, software, users, and the immediate environment.

System Life Cycle

System life cycle is the stages carried out when developing a new system.

Organizational Issue Planning Aims to Eliminate

Planning a system is an attempt to anticipate potential organizational issues:

  • Problems arise in guiding organization and business strategies
  • Insufficient stakeholder and end-user communication
  • Problems with ownership of the system
  • The lack of attention in required training

Feasibility Report

Feasibility reports are the results of a feasibility study where the evaluation and analysis of a project and its potential is carried out based on:

  • Technical feasibility
    • Determining whether current technology sufficient to implement the system
    • Example: A school wishes to deploy a fingerprint-based attendance system. The technical feasibility study checks whether the school's existing network infrastructure can support biometric scanners and whether compatible SDKs exist for the chosen platform.
  • Economic feasibility
    • Determining the cost effectiveness and whether funding is sufficient
    • Example: A hospital considers a new patient records system costing 500,000.Theeconomicfeasibilitystudycalculatesthatthesystemwillsave500,000. The economic feasibility study calculates that the system will save 200,000 per year in reduced paperwork and fewer errors, yielding a payback period of 2.5 years, which is within the hospital's acceptable threshold.
  • Legal feasibility
    • Analyzing potential conflicts between the proposed system and the legal system
    • Example: An e-commerce company planning to store customer data must evaluate whether the proposed database architecture complies with GDPR or other applicable data protection legislation, including requirements for data minimisation and the right to erasure.
  • Operational feasibility
    • Determining whether the maintenance stage of the system is feasible
    • Example: A small accounting firm is considering an enterprise resource planning (ERP) system. The operational feasibility study reveals the firm has no in-house IT staff and would need to hire a system administrator, making long-term maintenance impractical without outsourcing.
  • Schedule feasibility
    • Estimating the time required to create the system
    • Example: A university needs a new online exam registration portal ready before the next academic year in 8 months. The schedule feasibility study breaks the project into milestones and determines whether each can be completed in time.

Requirements Elicitation

Requirements elicitation is the process of gathering system requirements from stakeholders. Common techniques include:

TechniqueDescriptionAdvantagesDisadvantages
InterviewsOne-on-one structured or semi-structured conversations with stakeholdersIn-depth responses; follow-up questions possibleTime-consuming; may be influenced by interviewer bias
QuestionnairesWritten sets of questions distributed to a large audienceReaches many stakeholders quickly; easy to quantifyLow response rate; limited depth of answers
ObservationWatching users perform their current tasks in their normal environmentReveals actual workflow issues users may not reportUsers may change behaviour when observed
Document reviewAnalysing existing documentation, reports, forms, and proceduresNon-intrusive; provides objective baselineDocuments may be outdated or incomplete

Stakeholder Analysis Matrix

A stakeholder analysis matrix helps prioritise stakeholder engagement during planning:

StakeholderInterest levelInfluence levelEngagement strategy
Senior managementHighHighManage closely; regular briefings
End usersHighMediumKeep informed; involve in testing
IT departmentMediumHighConsult early; involve in design
External vendorsLowMediumMonitor; contractual communication
RegulatorsLowHighSatisfy through compliance checks

Gantt Chart Concepts

A Gantt chart is a horizontal bar chart used in schedule feasibility to visualise project tasks, their durations, and dependencies.

Task Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
Requirements gathering |=====|
System design |=======|
Development |===========================|
Testing |=====|
Training |=====|
Deployment |=====|
  • Each bar represents a task's duration
  • Dependencies are shown where one task must finish before the next begins
  • Critical path: the longest sequence of dependent tasks that determines the minimum project duration

Change Management

Change management is the process of changing the state of the organization, involving shifting employee positions, replacing hardware equipment, etc.

Incompatibility

System may include critical points built with legacy systems, where the new system is unable to replace by change, examples being:

  • Lack of ability to translate legacy format to new format.
  • User needs, where a lack of user training or the new system does not completely replace the functionality of the old system.

Resistance to Change

Employees often resist new systems. Understanding the reasons allows management to plan mitigation strategies:

Reason for resistanceDescriptionMitigation strategy
Fear of redundancyEmployees worry the new system will eliminate their jobsCommunicate that the system augments rather than replaces roles; retrain staff for new responsibilities
Loss of competenceStaff feel their existing skills will become irrelevantProvide comprehensive training programmes before deployment
Disruption of routineThe new system changes familiar workflowsUse phased changeover to allow gradual adaptation
Lack of involvementStaff feel the change was imposed without consultationInvolve employees early in requirements elicitation and pilot testing
Past failuresPrevious system changes failed, reducing trustAcknowledge past issues, explain what will be different, and provide evidence of thorough planning

Lewin's Change Management Model

Lewin's model describes change in three stages:

  1. Unfreeze: Prepare the organisation for change. Communicate the reasons for change, create a sense of urgency, and reduce resistance. For example, presenting data showing that the current manual inventory system causes a 15% error rate that costs the company $300,000 annually.
  2. Change (Transition): Implement the new system. This involves training, support, and gradual adoption. For example, rolling out the new inventory system department by department over three months with on-site support staff.
  3. Refreeze: Stabilise the organisation around the new system. Update procedures, embed new workflows into standard operations, and remove access to the old system.

Training Needs Analysis

Before deploying a new system, a training needs analysis (TNA) identifies the gap between current skills and required skills:

StepActionExample
1. Identify required skillsDetermine what the new system demands of usersThe new ERP system requires users to navigate a multi-module dashboard and generate reports
2. Assess current skillsEvaluate existing competency levelsA survey reveals 60% of staff rate their spreadsheet skills as basic; 10% have used an ERP system before
3. Identify the gapCompare required skills against current skillsMost staff need training on dashboard navigation, report generation, and data entry workflows
4. Design trainingPlan training methods, duration, and materialsThree-day instructor-led workshop, followed by online refresher modules and a help desk
5. Evaluate trainingMeasure whether the training achieved its objectivesPost-training assessment shows 85% of staff can independently perform core tasks

Impact Assessment Framework

An impact assessment evaluates how the new system will affect the organisation across multiple dimensions:

DimensionQuestions to askExample findings
OperationalHow will daily workflows change?Order processing time will decrease from 45 minutes to 12 minutes per order
FinancialWhat are the costs and expected savings?Initial cost of 150,000;annualsavingsof150,000; annual savings of 60,000 from reduced manual processing
TechnicalWhat infrastructure changes are needed?Server upgrade required; new network switches for increased bandwidth
HumanHow will staff roles and responsibilities change?Three data entry clerks will be retrained as system analysts
LegalAre there compliance implications?New data retention policies must align with GDPR Article 5

Worked Example: Planning a System Migration for a School Library

Scenario: A school library currently uses a standalone desktop application (LibrarySoft v3) running on Windows 7 to manage book loans. The school has decided to migrate to a cloud-based library management system (CloudLib).

Step 1 -- Stakeholder analysis:

  • Librarian (primary user): needs full catalogue management and loan tracking
  • Students (secondary users): need search and reservation capabilities
  • IT department: needs to manage the migration and ongoing access
  • School administration: needs cost justification and data security assurance

Step 2 -- Feasibility assessment:

  • Technical: CloudLib is browser-based; existing school computers support modern browsers. Internet bandwidth must be verified.
  • Economic: CloudLib costs 2,000peryear.SavingsfromeliminatingtheWindows7maintenancecontract(2,000 per year. Savings from eliminating the Windows 7 maintenance contract (1,500/year) and reduced librarian overtime ($3,000/year) justify the investment.
  • Operational: The librarian has used only LibrarySoft for 10 years and will require training.
  • Schedule: Migration planned over the 6-week summer break.

Step 3 -- Data migration plan:

  1. Export all bibliographic records from LibrarySoft in MARC21 format
  2. Transform MARC21 records to CloudLib's JSON import format using a custom Python script
  3. Validate that all 12,500 records were successfully imported with correct metadata
  4. Perform a parallel run for the first 2 weeks of term

Step 4 -- Change management:

  • Unfreeze: Present the librarian with a report showing that CloudLib will allow students to search the catalogue from home, reducing in-person queries by an estimated 40%.
  • Change: Enrol the librarian in a 2-day CloudLib training course. Assign an IT staff member as on-site support for the first month.
  • Refreeze: Decommission the LibrarySoft workstation after the parallel run confirms data integrity.

Step 5 -- Risk register:

RiskLikelihoodImpactMitigation
Data loss during migrationLowHighFull backup of LibrarySoft database before migration; validation of record counts
Librarian unable to adaptMediumMediumExtended training period; option to revert during parallel run
Internet outage during termLowHighMaintain a cached local copy of the catalogue for offline browsing

Business Merger

Business merger is the process of combining business entities, where all subsystems are required to be compatible.

System Integration

System integration is the process of combining subsystems, where there are four strategies:

StrategyDescriptionAdvantagesDisadvantages
Operate in redundancyRun both systems simultaneously; each system handles its original user baseLowest short-term risk; no data migration required immediatelyHigh ongoing cost; data inconsistency between systems; duplicated effort
Replace both with new systemBuild an entirely new system that replaces both legacy systemsOpportunity to modernise; eliminates legacy technical debtHighest cost and risk; longest timeline; requires full requirements gathering from scratch
Best-of-breed selectionSelect the strongest subsystems from each company and combine themLeverages existing strengths; may produce the best overall systemComplex integration between heterogeneous subsystems; compatibility issues
Single system adoptionChoose one company's system and terminate the otherSimplest integration; lower cost than replacementUsers of the discontinued system must adapt; some functionality may be lost

Real-world examples:

  • Operate in redundancy: After a bank merger, both banks' mobile banking apps continue to operate independently for 12 months while a unified platform is developed.
  • Replace both with new system: Two airlines merge and commission a completely new reservation system rather than adapting either existing system.
  • Best-of-breed selection: A merged pharmaceutical company adopts Company A's inventory management system (rated superior) and Company B's HR payroll system (rated superior), connecting them via middleware.
  • Single system adoption: An acquired startup's customer data is migrated entirely into the acquiring company's CRM, and the startup's CRM is decommissioned.

Data Migration Challenges

Data migration during a merger presents several challenges:

  • Schema mapping: The two companies may use different database schemas. For example, Company A stores addresses as a single text field, while Company B stores them as separate street, city, and postal code fields. A mapping table must define how each field in the source schema corresponds to a field in the target schema.
  • Data cleansing: Legacy data often contains duplicates, outdated records, and inconsistencies. For example, the same customer might appear in both databases with slightly different spellings of their name. Deduplication rules and data standardisation must be applied before migration.
  • Data integrity: Referential integrity must be maintained. For example, every order record must reference a valid customer record. If customer records are merged or deleted, all dependent records must be updated accordingly.

ETL Pipeline

The ETL (Extract-Transform-Load) pipeline is the standard approach for data migration:

  1. Extract: Pull data from source systems. This may involve reading from databases, flat files, APIs, or a combination. Extraction must preserve data types and handle character encoding (e.g., UTF-8 vs. ASCII).
  2. Transform: Apply business rules to convert data into the target format. This includes:
    • Format conversion (e.g., date from DD/MM/YYYY to YYYY-MM-DD)
    • Data type casting (e.g., string "42" to integer 42)
    • Lookups and enrichment (e.g., mapping legacy department codes to new codes)
    • Filtering out records that do not meet quality thresholds
  3. Load: Insert the transformed data into the target system. Loading may be done in batches to manage performance and allow rollback if errors are detected.
  4. Validate: After loading, run validation queries to confirm record counts match, referential integrity is maintained, and no data was truncated or corrupted.

System Deployment Models

On-premises Software

On-premises software are software operate locally on an organization's own infrastructure.

SaaS

Software-as-a-Service (SaaS) are software provided by cloud service, where data and the software is operating in a remote datacenter.

Installation Process

The installation process is the deployment of a new system on a premise.

Changeover Method

When replacing the system currently used, strategies employed should consider the cost overhead and risk, common strategies include:

  • Parallel changeover
    • Operating both systems in redundancy for the duration of replacement.
    • Advantages:
      • Functionality of both systems can be compared live
      • If the new system fails, the system can be reverted to the legacy system
    • Disadvantages:
      • Large cost overhead
      • Extra workload
  • Direct changeover
    • The old system is decommissioned and the new system takes over immediately on a specified date.
    • Advantages: lowest cost; no duplicated effort
    • Disadvantages: highest risk; no fallback if the new system fails
  • Pilot testing
    • The new system is deployed to a single department or location as a trial before organisation-wide rollout.
    • Advantages: limits the impact of any failures; provides real user feedback
    • Disadvantages: pilot users may have a different experience from the broader organisation
  • Phased
    • The new system is introduced module by module or department by department over a planned schedule.
    • Advantages: manageable risk at each stage; allows learning from earlier phases
    • Disadvantages: requires careful planning of dependencies between phases; temporary interfaces may be needed between old and new modules

Testing

Types of Testing

  • Functional testing
    • Testing conducted to validate the functionality of target commands.
    • Example: Testing that the "checkout" button on an e-commerce site correctly deducts the item from inventory, charges the correct amount, and sends a confirmation email.
  • Data testing
    • Testing conducted to validate the output of target commands by sets of normal, abnormal and boundary data.
    • Normal data refers to a input sequence set within the expected domain
    • Abnormal data refers to a input sequence set outside of the expected domain
    • Boundary data refers to a input sequence set at the boundary of the normal data set
  • Alpha testing
    • Testing carried out by the development team within the company and deployed on premises.
    • Simulates a real operating environment but is conducted by developers, not end-users.
  • Beta testing
    • Testing carried out by assigned end-users outside of the company and deployed on user premises.
    • Users report bugs and usability issues they encounter in their real environment.
  • Dry-run testing
    • Testing carried out by examining the source code and determining the functionality by predicting the output.
  • Unit testing
    • Testing on individual subsystems modularly.
    • Example: Testing a single function calculateTax(price, rate) in isolation to verify it returns the correct tax amount for various inputs.
  • User acceptance testing (UAT)
    • Testing for user satisfaction based on its usability and accessibility.
    • Conducted by the client or end-users to determine whether the system meets their business requirements before final sign-off.
  • Debugging
    • Testing during development to discover malfunctions.

Comparison: Alpha vs Beta vs UAT

CriterionAlpha testingBeta testingUser acceptance testing
Who testsDevelopment teamSelected end-usersClient or business stakeholders
WhereDeveloper environment (in-house)User environment (external)User environment (external)
GoalIdentify bugs before wider releaseTest in real-world conditionsConfirm business requirements are met
System stateNot yet feature-completeFeature-completeFeature-complete and stable
Bug reportingInternal bug trackerFeedback forms or issue trackerFormal sign-off process

Test Case Design Techniques

Equivalence Partitioning

Equivalence partitioning divides input data into partitions (classes) where the system is expected to behave the same for all values within a partition. One representative value from each partition is tested.

Example: A registration form requires the user's age to be between 18 and 65.

PartitionRangeTest value
Valid18 to 6530
Invalid (below)less than 1815
Invalid (above)greater than 6570

Only three test cases are needed to cover all equivalence classes.

Boundary Value Analysis

Boundary value analysis tests values at the edges of equivalence partitions, because errors frequently occur at boundaries.

Using the same age example (valid range 18 to 65):

BoundaryTest valueExpected result
Just below lower bound17Rejected
Lower bound18Accepted
Just above lower bound19Accepted
Just below upper bound64Accepted
Upper bound65Accepted
Just above upper bound66Rejected

Stubs and Drivers

When testing individual modules that depend on other modules not yet developed, stubs and drivers are used as substitutes:

ComponentDefinitionWhen usedExample
StubA dummy module that simulates a called moduleBottom-up testingA stub that returns a fixed value when the getCustomerName() function is called, allowing the calling module to be tested without the real database module
DriverA dummy module that calls a module being testedTop-down testingA driver that passes a series of test inputs to the calculateDiscount() function and displays the results, allowing the function to be tested without the full user interface

Traceability Matrix

A traceability matrix maps requirements to test cases to ensure complete test coverage:

Requirement IDRequirement descriptionTest case IDTest case descriptionStatus
R01User can search by titleTC01Search with valid title keywordPass
R02Maximum 5 loans per memberTC02Attempt 6th loanPass
R03Overdue books flagged after 14 daysTC03Check book status at day 15Pass
R04Daily overdue report generatedTC04Verify report contentsFail

If any test case fails or a requirement has no corresponding test case, the matrix highlights the gap.

Data Validation

Validation is the process of evaluating whether input sequence fit within the expected domain.

Data Verification

Verification is the process of evaluating the consistency of the input sequence and the source data.

Worked Example: Designing Test Cases for a Login System

System specification: A login system accepts a username (6 to 20 alphanumeric characters) and a password (8 to 128 characters, must include at least one uppercase letter and one digit). After 3 failed attempts, the account is locked for 15 minutes.

Test cases using equivalence partitioning and boundary value analysis:

Test IDTest descriptionInputExpected resultTechnique
TC01Valid loginUsername: "student01", Password: "Pass1234"Login successfulNormal data
TC02Username too shortUsername: "abc", Password: "Pass1234"Error: username must be 6-20 charactersBoundary
TC03Username exactly 6 charactersUsername: "abc123", Password: "Pass1234"Login successfulBoundary
TC04Username exactly 20 charactersUsername: "abcdefghijklmnopqrst", Password: "Pass1234"Login successfulBoundary
TC05Username 21 charactersUsername: "abcdefghijklmnopqrstu", Password: "Pass1234"Error: username must be 6-20 charactersBoundary
TC06Password without uppercaseUsername: "student01", Password: "pass1234"Error: password must include uppercaseAbnormal
TC07Password without digitUsername: "student01", Password: "Password"Error: password must include digitAbnormal
TC08Password exactly 8 charactersUsername: "student01", Password: "Passw0r"Login successfulBoundary
TC09Third failed attempt locks accountUsername: "student01", 3 incorrect passwordsAccount locked for 15 minutesBoundary
TC10Second failed attempt does not lockUsername: "student01", 2 incorrect passwordsError message; account not lockedBoundary

User Documentation

User documentations are manuals design to explain the functionality of the system to the end-user.

Methods of Providing User Documentation

The term user documentation does not restrict the form of access, where online and written documents are allowed, some methods of providing the user documentation include:

  • User Manuel
  • Embedded Assistance Subsystem
  • Real time assistance
  • Email Support
  • Web support
  • FAQ
  • Remote desktop connection

User Training

In order to equip the workforce with a new system, user training is required to ensure the system is used for its full capacity, some methods include:

  • Self-study
  • Formal classes
  • Remote training

Data Loss

Data loss is the error condition for which the information stored is destroyed. The cause of data loss can include:

  • Accidental deletion
  • Administrative errors
  • Poor storage system
  • Hardware damage
  • Computer virus
  • Data corruption
  • Natural disasters
  • Power failure

Data Loss Prevention

  • Regular Backup (mirroring) with a remote datacenter or with SaaS
  • Firewall installation
  • Storing on printed copies
  • Usage of antivirus software
  • Failover system
    • A autonomous system on standby for switching to a parallel computer system upon a system failure

The 3-2-1 Backup Rule

The 3-2-1 rule is a widely recommended backup strategy:

  • 3 copies of data: the original data plus two backups
  • 2 different storage media: e.g., local hard drive and cloud storage
  • 1 off-site copy: at least one backup stored in a geographically separate location

Example: A company stores its primary database on a server in the London office (copy 1, media 1). An incremental backup runs nightly to a NAS device in the same office (copy 2, media 2). A full backup is uploaded weekly to a cloud provider with data centres in Frankfurt (copy 3, media 3, off-site).

RAID Levels

RAID (Redundant Array of Independent Disks) provides data redundancy and performance improvements:

RAID levelDescriptionMinimum disksRedundancyUse case
RAID 0Data is striped across disks for performance2NoneTemporary data, gaming systems where speed matters more than safety
RAID 1Data is mirrored identically on each disk2Full (1 disk can fail)Critical databases where uptime is essential
RAID 5Data is striped with distributed parity across all disks3Single disk toleranceFile servers balancing performance, capacity, and redundancy

Disaster Recovery Plan

A disaster recovery plan (DRP) documents the procedures for restoring IT systems after a catastrophic event. Key components include:

  1. Recovery objectives:
    • RPO (Recovery Point Objective): the maximum acceptable amount of data loss, measured in time. An RPO of 1 hour means the organisation can tolerate losing at most 1 hour of data.
    • RTO (Recovery Time Objective): the maximum acceptable downtime before systems must be restored. An RTO of 4 hours means the system must be back online within 4 hours.
  2. Roles and responsibilities: specify who is responsible for executing each step of the recovery.
  3. Inventory of critical systems: prioritise which systems must be restored first based on business impact.
  4. Communication plan: how to notify staff, customers, and regulators during and after the disaster.
  5. Testing schedule: regular drills to verify the plan works, typically at least annually.

Hot, Warm, and Cold Standby

Standby typeDescriptionRecovery timeCostUse case
Hot standbyA fully operational duplicate system running in real-time synchronisation with the primaryNear-instant (seconds to minutes)HighestCore banking systems, emergency services
Warm standbyA system with hardware provisioned and data periodically synchronised, but not running liveMinutes to hoursMediumE-commerce platforms, corporate email
Cold standbyAn empty or minimally configured system that must be set up from scratch or from backupsHours to daysLowestArchival systems, non-critical internal tools

Software Deployment

The versioning system of a system is usually divided by:

  • Patches
    • Bug fixes
  • Updates
    • Expansion by increasing functionalities
  • Upgrades
    • Large changes that normally lead to breaking changes (incompatibility between the new version and previous version)
  • Releases
    • Version released to end-users after testing stages.

Semantic Versioning

Semantic versioning (SemVer) uses a three-part version number in the format major.minor.patch:

ComponentIncremented whenExample
MajorBreaking changes that are incompatible with previous versions2.0.0 when the API requires all clients to be updated
MinorNew features added in a backward-compatible way1.5.0 when a new search filter is added without changing existing endpoints
PatchBug fixes that do not change functionality1.5.1 when a calculation error in the search filter is corrected

Pre-release and build metadata: Versions may include labels such as 1.0.0-alpha.1, 1.0.0-beta.2, or 1.0.0-rc.1 to indicate pre-release versions.

Continuous Delivery vs Continuous Deployment

AspectContinuous deliveryContinuous deployment
DefinitionCode changes are automatically prepared for release but require manual approval before going liveEvery code change that passes automated tests is automatically released to production
Human interventionYes -- a person approves the deploymentNo -- fully automated pipeline
RiskLower than continuous deployment; humans can catch issues automation missesHigher; requires extremely thorough automated testing
SpeedSlower; depends on approval processFastest; changes reach users as soon as they are ready

Rollback Strategies

When a deployment causes problems, rollback strategies allow the system to revert to a previous stable state:

  • Blue-green deployment: Two identical production environments are maintained. The new version is deployed to the inactive environment (e.g., "green") while the current version runs on "blue". Traffic is switched to green. If issues arise, traffic is switched back to blue.
  • Canary release: The new version is rolled out to a small percentage of users (e.g., 5%). If monitoring shows no issues, the rollout is gradually increased. If issues are detected, the rollout is stopped and traffic is reverted to the previous version.
  • Database migration rollback: Each database schema change must have a corresponding "down" migration that reverses the change. For example, if a migration adds a phone_number column, the down migration removes it.

Feature Flags

Feature flags (also called feature toggles) allow developers to enable or disable features without deploying new code:

  • Use cases:
    • Deploying code to production but keeping a new feature hidden until it is ready to launch
    • Performing A/B testing by showing a feature to 50% of users
    • Quickly disabling a misbehaving feature without a full rollback
  • Implementation: A boolean variable (stored in a configuration file or database) controls whether a code path is executed. For example, if (featureFlags.newDashboard) { renderNewDashboard(); } else { renderOldDashboard(); }

Problem Set

Question 1

A hospital is planning to replace its paper-based patient records system with an electronic health record (EHR) system.

(a) Describe two feasibility types the hospital should assess before proceeding, providing a specific example for each. [4 marks]

(b) Explain why the hospital should conduct a training needs analysis before deploying the new system. [3 marks]

Details

(a)

Technical feasibility: The hospital must assess whether its existing network infrastructure can support the EHR system. For example, the system may require encrypted connections between wards and a central server, and the hospital must verify that its current network switches and cabling support the required bandwidth and security protocols.

Operational feasibility: The hospital must determine whether the new system can be maintained by its IT staff. For example, the EHR system may require a dedicated database administrator and 24/7 support, which the hospital's current IT team of two staff members may not be able to provide without additional hiring.

(b)

A training needs analysis identifies the gap between staff's current skills and the skills required by the new EHR system. Without this analysis, the hospital risks deploying a system that doctors and nurses cannot use effectively, which could lead to incorrect data entry, workflow disruptions, or even patient safety incidents. The analysis ensures that training is targeted, efficient, and appropriately resourced, covering only the skills that staff actually lack.

Question 2

A school is migrating from a locally installed student management system to a cloud-based system over the summer break. The IT coordinator has proposed a direct changeover on the first day of term.

(a) Evaluate this changeover strategy. [4 marks]

(b) Describe an alternative changeover strategy that would reduce risk, and explain why it is more appropriate in this context. [4 marks]

Details

(a)

A direct changeover is the riskiest strategy because the old system is decommissioned immediately and the new system must work flawlessly from day one. If the cloud-based system experiences downtime, has a data migration error, or if staff encounter usability issues, there is no fallback. In a school context, this could mean that attendance cannot be recorded, grades cannot be entered, and parent communications are disrupted, directly affecting educational operations. The only advantage is that it avoids the cost and complexity of running two systems simultaneously.

(b)

A phased changeover would be more appropriate. The school could migrate one module at a time, for example: student enrolment in week 1, attendance tracking in week 2, grade management in week 3, and report generation in week 4. This limits the impact of any failure to a single module. Alternatively, a pilot changeover could be used, where the system is first deployed to a single year group or department. This allows real issues to be identified and resolved before the entire school is affected.

Question 3

Two companies, AlphaTech and BetaCorp, are merging. AlphaTech uses an Oracle database for customer records, while BetaCorp uses a PostgreSQL database. Both databases contain overlapping customer records.

(a) Explain why schema mapping is necessary during the data migration process. [3 marks]

(b) Describe the purpose of data cleansing in this scenario, giving a specific example. [3 marks]

(c) Outline the ETL process that should be followed. [4 marks]

Details

(a)

Schema mapping is necessary because AlphaTech and BetaCorp use different database schemas to store customer data. For example, AlphaTech may store a customer's full name in a single FULL_NAME column, while BetaCorp stores it as FIRST_NAME and LAST_NAME in separate columns. Schema mapping defines how each field in the source (AlphaTech and BetaCorp databases) corresponds to a field in the target (merged database), ensuring that no data is lost or misinterpreted during migration.

(b)

Data cleansing ensures the quality of the merged dataset. A specific example is deduplication: the same customer may exist in both databases with slight variations, such as "Jonathan Smith" in AlphaTech and "Jon Smith" in BetaCorp with the same email address. Data cleansing would identify these as the same person and merge them into a single record, preventing duplicate mailings and confusion in customer service.

(c)

  1. Extract: Pull all customer records from both the Oracle database (AlphaTech) and the PostgreSQL database (BetaCorp) using SQL queries or export tools.
  2. Transform: Apply schema mapping to convert both datasets to the unified target schema. Apply data cleansing rules including deduplication, standardising date formats (e.g., converting all dates to ISO 8601), and validating email addresses.
  3. Load: Insert the transformed, deduplicated records into the new merged database in batches, with each batch verified before the next begins.
  4. Validate: Run queries to confirm that the total record count in the merged database is correct, that no records were truncated, and that referential integrity is maintained (e.g., every order references a valid customer).

Question 4

An online store requires users to enter their age during registration. The valid age range is 18 to 120 inclusive.

(a) Using boundary value analysis, state four test values the developer should use and the expected result for each. [4 marks]

(b) Explain the difference between validation and verification in the context of this registration form. [4 marks]

Details

(a)

Test valueExpected resultReason
17RejectedJust below the lower boundary
18AcceptedAt the lower boundary
120AcceptedAt the upper boundary
121RejectedJust above the upper boundary

(b)

Validation checks whether the input data conforms to the specified rules. In this context, validation ensures the age entered is between 18 and 120, is a whole number, and is in a valid format. Validation is performed by the system (e.g., the form rejects an age of "abc" or "15").

Verification checks whether the data entered matches the true source data. In this context, verification ensures that the age the user entered is actually their real age. For example, a user might enter "25" when they are actually 17. The system cannot verify this automatically; it may require supporting documentation (e.g., a government ID) to be manually checked against the entered value.

Question 5

A software company uses semantic versioning for its product. The current version is 2.3.1.

(a) The development team fixes a bug that caused reports to display incorrect totals. What should the new version number be? Justify your answer. [2 marks]

(b) The team then adds a new feature allowing users to export reports as PDF files. What should the version number be now? Justify your answer. [2 marks]

(c) The team then restructures the entire database schema, making it incompatible with version 2.x. What should the version number be? Justify your answer. [2 marks]

(d) Describe two rollback strategies the company could use if a deployment causes a critical failure. [4 marks]

Details

(a)

2.3.2 -- the patch number is incremented because this is a bug fix that does not add functionality or change compatibility.

(b)

2.4.0 -- the minor version is incremented because a new backward-compatible feature (PDF export) has been added without breaking existing functionality.

(c)

3.0.0 -- the major version is incremented because the database schema change is a breaking change that is incompatible with version 2.x. Clients using version 2.x will not be able to use the new version without migration.

(d)

Blue-green deployment: The company maintains two identical production environments. The new version is deployed to the inactive environment and thoroughly tested before traffic is switched. If the critical failure is detected after the switch, traffic is immediately routed back to the original environment, providing near-instant recovery.

Feature flags: If the failure is caused by a specific feature, the feature flag controlling that feature can be set to false without requiring a full rollback or redeployment. This disables the problematic feature while keeping the rest of the system operational.

Question 6

A logistics company stores all shipment data on a single server in its main office. The IT manager has been asked to improve data loss prevention.

(a) Explain the 3-2-1 backup rule and describe how it could be applied in this logistics company. [5 marks]

(b) The company wants to minimise downtime after a server failure. Compare hot standby and warm standby as solutions. [4 marks]

(c) Define the terms RPO and RTO, and suggest appropriate values for a logistics company whose shipments must be tracked within 30 minutes of any update. [4 marks]

Details

(a)

The 3-2-1 rule requires: 3 copies of data (original plus two backups), stored on 2 different types of storage media, with 1 copy kept off-site.

Application: The logistics company keeps the original shipment database on the main server (copy 1, on local SSD). A nightly backup is written to a NAS device in the office (copy 2, on HDD -- different media). A weekly full backup is uploaded to a cloud storage provider in a different city (copy 3, off-site, on cloud storage -- different media). This ensures that if the server fails, the NAS fails, or the entire office is affected by a fire or flood, at least one copy of the data survives.

(b)

AspectHot standbyWarm standby
SetupA duplicate server runs continuously, receiving real-time data replication from the primaryA server is provisioned with compatible hardware and software, but data is synchronised periodically (e.g., every hour)
Recovery timeNear-instant; traffic can be redirected to the standby within secondsSlower; the standby must be brought online and data must be synchronised from the last backup
CostHighest -- requires a fully operational duplicate server running at all timesMedium -- the standby server exists but does not consume resources until needed
Data currencyFully up to date; no data lossMay lose data changes made since the last synchronisation

(c)

RPO (Recovery Point Objective): The maximum acceptable amount of data loss, measured in time. For this logistics company, an RPO of 30 minutes would be appropriate, meaning at most 30 minutes of shipment tracking updates could be lost in a disaster. This requires data to be backed up or replicated at least every 30 minutes.

RTO (Recovery Time Objective): The maximum acceptable downtime before the system must be restored. For a logistics company that needs continuous shipment tracking, an RTO of 1 hour would be appropriate, meaning the system must be back online within 1 hour of a failure. Achieving this RTO would likely require a hot standby configuration.